tag:blogger.com,1999:blog-1845749777682346343.post8759784654977750309..comments2022-12-02T09:29:11.036+00:00Comments on Broadway Station Rebuild: Block postAnonymoushttp://www.blogger.com/profile/14786840194849538417noreply@blogger.comBlogger4125tag:blogger.com,1999:blog-1845749777682346343.post-22486462802876728352016-01-11T18:30:49.522+00:002016-01-11T18:30:49.522+00:00The DPC will be laid on top of the course of split...The DPC will be laid on top of the course of split bricks which have been laid on top of the blocks.<br />The cavity is being filled with concrete up to DPC level, after that it will be filled with insulation.Anonymoushttps://www.blogger.com/profile/14786840194849538417noreply@blogger.comtag:blogger.com,1999:blog-1845749777682346343.post-79227874335985784312016-01-11T13:10:25.934+00:002016-01-11T13:10:25.934+00:00You are filling the 50mm gap with concrete in due ...You are filling the 50mm gap with concrete in due course. Will there be any wall insulation going in somewhere or have I missed something?Geoff Jhttps://www.blogger.com/profile/05493499100736423903noreply@blogger.comtag:blogger.com,1999:blog-1845749777682346343.post-49436614037739668072016-01-10T21:09:55.446+00:002016-01-10T21:09:55.446+00:00Have you not quite reached damp course level yet?Have you not quite reached damp course level yet?crossleydd42https://www.blogger.com/profile/05453918977873362519noreply@blogger.comtag:blogger.com,1999:blog-1845749777682346343.post-72359516989607807482016-01-10T11:36:28.390+00:002016-01-10T11:36:28.390+00:00Thanks for a detailed, interesting blog. Despite a...Thanks for a detailed, interesting blog. Despite all the rain it is amazing to be laying blocks or bricks outside at this time of the year.<br />Mike Rose.Anonymousnoreply@blogger.com